Annual Review 2022 27 Improving water supply and quality for a growing region Barber Grove to SeaviewWastewater Treatment Plant Pipe Duplication Design and construction of a 1.2 km long, 1 m diameter water pipeline using a mix of trenchless and open trench methods to suit the difficult seismic and geological conditions.
RkJQdWJsaXNoZXIy Mjk0NTM=