McConnell Dowell 2021 Annual Review

McConnell Dowell Group Annual Review 2021 31 Old Mangere Bridge Replacement McConnell Dowell was awarded the contract for the Waka Kotahi NZ Transport Agency project to deconstruct the 105-year-old bridge (the Old Māngere Bridge) and construct a new and improved replacement bridge to connect the communities of Onehunga and Māngere Bridge. The demolition of the old bridge and work to construct the new bridge will occur simultaneously from both the North and South sides of the harbour. The project is scheduled to be completed in 2022. Location Auckland, New Zealand Customer Waka Kotahi NZTA

RkJQdWJsaXNoZXIy Mjk0NTM=