McConnell Dowell 2018 Annual Review
Projects 1 2 South East Asia 1 Petronas Rapid 12b Solid Product Jetty, Malaysia The delivery of Engineering, Procurement, Construction and Commissioning (EPCC) of the Solid Product Jetty and associated Handling Facilities (SPJ) at Tanjung Setapa as part of the RAPID project in Malaysia. The package includes: • A Solid Handling Jetty comprising of a 1300 metres trestle, 710 metre jetty head, 2 container berths and a sulphur loading berth • Onshore Civil Works comprising of a container stacking yard, truck and trailer parks, a workshop area along with distributor roads and utilities • Industrial Buildings comprising of a 450 metre long sulphur stockpile warehouse, at terminal operation building, an administration building, workshop, substations and other ancillary buildings • A topside and landslide material handling system for sulphur with loaders and unloaders including all mechanical and electrical works 2 Tuas Road Bridges, Singapore The design and build of two road access bridge at Tuas Basin to serve an up and coming NEA and PUB integrated Waste Management Facility (IWMF) and Tuas Water Reclamation Plant (TWRP) will be constructed in the future. Two road bridges over the intake canal of Tuas Power Station • Route 2 Bridge - Vehicular Road Bridge, 500 metre long • Route 3 Bridge – Vehicular Road Bridge 750 metre long • Marine Deck 450 metre long at Tuas View Basin Constructing the bridge over Tuas Power Generation’s intake canal without encroaching into their area. To achieve this a bridge, with a 70 meter long span to was designed, one of the longest single spans in Singapore. 3 Nakhon Ratchasima Pipeline Extension, Thailand The Nakhon Ratchasima Pipeline Project is being delivered for PTT Public Company Limited, Thailand’s state-owned oil and gas company. The project involves the design, procurement, construction and commissioning of a 48 km, 28 inch diameter gas pipeline linking the Provincial Gas Transmission Pipeline Project to Nakhon Ratchasima Extension Phase. The works include procurement of all line pipe, valves and permanent materials, construction of four block valve stations and tie-in facilities, SCADA and communications systems. The project has employed innovation construction methodology including trenchless technology to minimise impact on stakeholders.
Made with FlippingBook
RkJQdWJsaXNoZXIy Mjk0NTM=