27 Annual Review 2020 Location: Singapore Customer: Marina Bay Sands Buildingworks include underwater and underground land path to shopping complex The Marina Bay Sands (MBS) project involved the demolition and reconstruction of the existing south crystal pavilion including significant structural alterations to the Basement 2 of the Shoppes Mall. A large rectangular water retaining piled cofferdam had to be constructed before the structure could be demolished and rebuilt from the seabed up, along with the construction of the underwater tunnel connection to the Shoppes at Marina Bay.