Mardie Salt Project Procurement Portal

PROJECT SUMMARY

The Mardie Salt and Potash Project (the Project) is 100% owned by Mardie Minerals Pty Ltd (MMPL), a wholly owned subsidiary of BCI Minerals Limited (BCIM). The Project involves the development of facilities to produce, process and export high purity industrial grade salt from seawater via solar evaporation, crystallisation and raw salt purification and fertilise grade sulphate of potash (SOP).

McConnell Dowell (MCD) has been contracted by MMPL to complete the Port Marine Structures Design and Construct Contract Works (the Works) including the design, construction and commissioning of an export facility capable of achieving an export capacity of 3,300TPH of industrial grade salt and sulphate of potash.

 

Projects works shall include:

  • 4km jetty conveyor and roadway;
  • jetty head-end platform;
  • dolphins;
  • channel markers;
  • conveying system; and
  • a shiploader.

Note:

  • The below list is an estimate of potential packages, for reference only, for the project
  • Supplier's wishing to submit Expressions of Interest (EOI) are to email This email address is being protected from spambots. You need JavaScript enabled to view it. with capability statement and areas of interest in the Project (this is a monitored email address).
  • Date(s) indicated below may change and this is only for information purposes.
  • MCD will screen and select suppliers based on local industry requirements / specialisation and capability to perform work as required
  • Registration on Felix does not mean you will be shortlisted for any packages but is a mandatory requirement for any Suppliers invited to RFQ's
  • To be listed on the MCD system, pre-qualification for registration to be done via https://mcconnelldowell.okfelix.com/panel_registration/registered_vendors
  • The project is D&C and will run over 1+ years so packages will come to market over a period of time.
  • Packages will be awarded both on price / non price factors.

 

Tender
Pkg No. 
Package
Description
 Notes  Status   RFQ release date
PK001 Pile Supply Overseas supply only in progress Planned 31-Mar-22
Actual 15-Mar-22
PK002 Precast Supply   not started Planned 09-Mar-22
Actual  
PK003 Structural Steel Overseas supply only in progress Planned 31-Mar-22
Actual 15-Mar-22
PK004 Overseas Logistics MCD panel providers only not started Planned 27-Sep-22
Actual  
PK005 Crane Supply   not started Planned 27-Sep-22
Actual  
PK006 Laydown Areas   not started Planned 27-Sep-22
Actual  
PK007 Stevedoring Services Included in PK004 cancelled Planned 27-Sep-22
Actual  
PK008 Transportable Switchrooms   not started Planned 03-Jun-22
Actual  
PK009 Piling Hammer   not started Planned 27-Sep-22
Actual  
PK010a Conveyor Belt S&I   not started Planned 25-Mar-22
Actual  
PK010b Conveyor Drive system   not started Planned 01-Apr-22
Actual  
PK010c Idlers & Pulleys   not started Planned 25-Mar-22
Actual  
PK010e Conveyor Weightometers   not started Planned 25-Mar-22
Actual  
PK010f Conveyor Belt Skirting   not started Planned 25-Mar-22
Actual  
PK010g Conveyor Belt Ploughs & Scrapers   not started Planned 25-Mar-22
Actual  
PK010i Conveyor Take Up winch   not started Planned 25-Mar-22
Actual  
PK010k Conveyor Chutes   not started Planned 01-Apr-22
Actual  
PK010l Grease Lube system   not started Planned 01-Apr-22
Actual  
PK010m Wind hoops / guards   not started Planned 01-Apr-22
Actual  
PK011 Bearings Supply   not started Planned 01-Apr-22
Actual  
PK012 Fenders & Marine Furniture   not started Planned 27-Sep-22
Actual  
PK013 Cast in items   not started Planned 27-Sep-22
Actual  
PK014 Barge Supply   not started Planned 27-Sep-22
Actual  
PK015 Marine Vessels (Tugs / Wboats)   not started Planned 27-Sep-22
Actual  
PK016 Guardrails   not started Planned 27-Sep-22
Actual  
PK017 Cathodic Protection   not started Planned 27-Sep-22
Actual  
PK018 Grout Supply   not started Planned 27-Sep-22
Actual  
PK019 Electrical Services   not started Planned 27-May-22
Actual  
PK020 Cable Supply   not started Planned 27-May-22
Actual  
PK021 Cable Ladder Supply   not started Planned 31-Mar-22
Actual  
PK022 Lighting Supply   not started Planned 27-May-22
Actual  
PK023 Conduit Supply   not started Planned 27-May-22
Actual  
PK024 Conveyor Safety Equipment   not started Planned 25-Mar-22
Actual  
PK025 Misc Electrical Equipment   not started Planned 27-May-22
Actual  
PK026 3166SS Pipe & Fittings   not started Planned 27-Sep-22
Actual  
PK027 HDPE Pipe & Fittings   not started Planned 27-Sep-22
Actual  
PK028 Drilling   not started Planned 27-Sep-22
Actual  
PK029 Valves   not started Planned 27-Sep-22
Actual  
PK030 HDPE Welding   not started Planned 27-Sep-22
Actual  
PK031 Road Transport   not started Planned 27-Sep-22
Actual  
PK032 Navigation Lights   not started Planned 27-Sep-22
Actual  
PK033 Mobile batch plant   on hold Planned 27-Sep-22
Actual  
PK034 Labour Hire   not started Planned 27-Sep-22
Actual  
PK035 Site Sheds   not started Planned 27-Sep-22
Actual  
PK036a Earthworks - Abutment   not started Planned 27-Sep-22
Actual  
PK036b Rock Protection - Abutment   not started Planned 27-Sep-22
Actual  
PK037 Bus Services   not started Planned 27-Sep-22
Actual  
PK038 Fuel Supply   not started Planned 27-Sep-22
Actual  
PK039 Permanent Buildings   not started Planned 27-Sep-22
Actual  
PK040 Water pumps / hydrants   not started Planned 27-Sep-22
Actual  
PK041 Water tanks   not started Planned 27-Sep-22
Actual  
PK042 Jetty platform fixed crane   not started Planned 27-Sep-22
Actual  
PK043 Gates and Fences   not started Planned 27-Sep-22
Actual  
PK044 JIB Crane   not started Planned 27-Sep-22
Actual  
PK045 Shiploader   not started Planned 27-Sep-22
Actual