Introduction General

Introduction General

Thank you for the opportunity to present this brief capability statement which details a cross-section of our skills and experience, and showcases a selection of our recent projects.

Vic & Tas Intro (typically use 4th to 8th)

Vic & Tas Intro (typically use 4th to 8th)

Victoria has been the location of McConnell Dowell's global headquarters for over 40 years, and as our home base we've built a solid reputation across a range of markets and industries in the state.

We are very active in the transport sector and are currently delivering or have completed a series of road and rail projects for the major transport authorities such as Major Road Projects Victoria and the Level Crossing Removal Project. In Tasmania we most recently completed the New Bridgewater Bridge, Tasmania's largest ever transport infrastructure project.

We are also active in the ports sector with a number of projects completed for the Port of Melbourne, the airports sector with multiple projects delivered at Tullamarine International Airport, and the water sector with water pipelines and dams a speciality.

SA Water Design and construct framework agreement North of Adelaide, South Australia

SA Water Frameworks

Improving the reliability and capacity of South Australia's water supply

In joint venture with Diona (the Water North JV) we're one of three major framework partners delivering SA Water’s multi-billion dollar capital delivery program. The 'Frameworks' model fosters collaboration and innovation in the planning and delivery of water projects across metro and regional South Australia.

During the first four years (2020 - 24) our team delivered approximately 150 projects, including the design and construction of:

Fast Facts

  • Collaborative delivery program
  • Approximately 150 individual projects in first 4 years
  • 60,000 m of water pipelines
  • 2 earth bank storage projects
  • 2 distribution pump stations
  • 21 water tank remediation works (including concrete & structural remediation)
SA Water Frameworks
Unitywater Design & Construct Sunshine Coast, Queensland

Aura and Harmony Infrastructure Program

Improving water and wastewater infrastructure

On behalf of Unitywater, we're delivering critical new water and wastewater infrastructure to support growth on Queensland's Sunshine Coast. The new pipelines, pump stations, and storage reservoirs will support the new Aura and Harmony communities in the Caloundra region.

For the Aura development (which will grow to 50,000 residents by 2050), we're delivering a new wastewater network that includes over 12 km of 900 mm diameter pipeline and one pump station. We're also delivering a new water supply network for this community, that includes over 12 km of 800 mm diameter pipeline connecting the Ewen Maddock Dam to a new 12 ML water reservoir.

Fast Facts

  • Large diameter (up to 900 mm) water and wastewater pipelines
  • 12 ML storage reservoirs
  • Pump stations
  • Open and trenchless pipeline construction techniques
Aura and Harmony Infrastructure Program
Gladstone Area Water Board Design & Construct Gladstone, Queensland

Fitzroy to Gladstone pipeline

Improving long-term water security

We're delivering the Fitzroy to Gladstone Pipeline (FGP) project for the Gladstone Area Water Board (GAWB) and the Queensland Government. The project, which will have the capacity to transport 30 gigalitres per annum, will enable long-term water security for urban and industrial customers in the region.

The FGP, which comprises an approximately 117 km long, 1 m diameter pipeline, a water treatment plant, reservoirs, and pumping stations, will also support the emerging hydrogen industry in the Gladstone region of Queensland. We have teamed up with BMD Constructions in a joint venture (the MBJV) to deliver the Project.

Fast Facts

  • 117 km long, 1 m diameter pipeline
  • New water treatment plant
  • Reservoirs and pumping stations
  • 21 trenchless crossings
  • $10 million First Nations spend
Fitzroy to Gladstone pipeline
SA Water Design and Construct Port Stanvac, South Australia

Adelaide Desalination Plant

Setting new benchmarks in efficiency and reliability

We were a member of the Adelaide Aqua consortia responsible for designing, building, and commissioning the Adelaide Desalination Plant, the state's largest ever infrastructure project. The reverse osmosis plant is one of the most efficient in the world and can produce 100 GL of fresh water each year.

The project encompassed all construction disciplines including bulk earthworks, civil structures, marine, tunnelling, mechanical, electrical, and building works. Some 10,000 people were employed during construction.

Fast Facts

  • 650,000 m3 of earthworks
  • 2 subsea tunnels: 1.4 km and 1.1 km long
  • 40 km of fibreglass, steel and PVC pipework
  • 12 buildings
  • 10,000 people employed during construction
Adelaide Desalination Plant
 Watercare Services Ltd Type: Design and Construct  Army Bay, Auckland, New Zealand

Army Bay Ocean Outfall

Record Breaking Direct Pipe Drive

Using state-of-the-art Direct Pipe® tunnelling technology for the first time in New Zealand helped us mitigate the significant risks we faced on Watercare's Army Bay Ocean Outfall project.

They engaged us to design and construct a new wastewater outfall, upgrade an existing pump station, and build a new ultraviolet disinfection facility to increase the outfall capacity of their Army Bay Wastewater Treatment Plant at Shakespear Regional Park.

Fast Facts

  • 3 km of gravity system replacement pipeline
  • 1.9 km of trenchless pipeline using the Direct Pipe® system
  • 1,100 mm OD HDPE liner pipe (installed within 1200mm OD steel casing)
  • 900 mm OD HDPE outfall pipeline
  • new UV treatment plant, including electrical controls and standby generator
  • 1929 m world record for the longest Direct Pipe® drive.
Army Bay Ocean Outfall
Genex Power Early Contractor Involvement Kidston, Queensland

Kidston Pumped Storage Hydro

A game-changing project for Australia's clean energy industry

We are constructing the Kidston Pumped Storage Hydro Project in Far North Queensland - an innovative project that involves the world-first conversion of a disused gold mine into a pumped storage hydroelectric power generation facility.

This first-of-its-kind natural battery storage facility has the potential to generate up to 250 MW of rapid response (less than 30 seconds), flexible power to Australia’s National Electricity Market.

Fast Facts

  • First-of-its-kind natural battery storage facility
  • 250 MW of rapid response (30 seconds) renewable energy
  • 4 year design development and technical optimisation leading up to construction
  • 800 jobs to be created during construction
Kidston Pumped Storage Hydro
Victorian & NSW State Governments Design and Construct Echuca, Victoria/NSW border

Echuca Moama Bridge

Providing locals and visitors with safer and easier travels between Echuca and Moama

An innovative bridge solution saw us secure the design and delivery of this important new river crossing for the Victorian and NSW state governments.

Completed four months ahead of schedule, construction of this vital second crossing between Echuca and Moama included new bridges over the Murray and Campaspe rivers, and two new flood relief bridges.

Fast Facts

  • 600 m of elevated structures, including a 115 m in-situ balanced cantilever box girder for main river crossing
  • Eight span 300 m Campaspe Bridge structure completed in 10 months
  • 400,000 tonnes of fill successfully imported through busy border tourist town
  • 125 Super-Tees (each 35 m long) used for bridge approaches
  • 10,000 tonnes of asphalt laid
  • 13.7 ha of habitat improvement works
Echuca Moama Bridge
Major Road Projects Victoria (MRPV) Design and Construct Melbourne, Victoria

Mordialloc Freeway

The McConnell Dowell Decmil Joint Venture delivered the Mordialloc Freeway in Melbourne’s south east four weeks ahead of schedule while setting new industry benchmarks in sustainability and workplace mental health management.

The nine kilometre freeway links the Mornington Peninsula Freeway at Springvale Road in Aspendale Gardens to the Dingley Bypass in Dingley Village, creating a continuous freeway from Frankston To Clayton.

Fast Facts

  • 9 km long multi-lane freeway
  • 6 road bridges constructed
  • 8 km of shared walking/cycling paths
  • 3 million tonnes of earthworks imported
  • 74 km of utilities relocated
  • 97% of construction waste diverted from landfill
Mordialloc Freeway
Inland Rail Design and construct North East region, Victoria

Inland Rail Victoria

Delivering part of Australia’s largest rail freight project

We delivered the first tranche of the Inland Rail project in Victoria - the Beveridge to Albury (B2A) package. The overall Inland Rail project will enable double-stacked freight trains to operate between Brisbane and Melbourne.

Our contract encompassed four 'rail enhancement' sites located in central and northern Victoria, as well as some corridor wide works. The enhancement site works included bridge replacements at Glenrowan, Wangaratta and Seymour; transformation of Wangaratta Station; and track lowering. Corridor wide scope included signalling works, track slews and overhead utilities.

Fast Facts

  • Site investigations, detailed design
  • Track enhancements at four sites - bridges, underpasses
  • Corridor-wide track slews and signalling works
Inland Rail Victoria
Rail Projects Victoria Alliance Geelong, Victoria

South Geelong to Waurn Ponds Rail Duplication

More frequent and reliable services on Victoria’s busiest regional rail line.

We were are a member of the Djilang Alliance which delivered the South Geelong to Waurn Ponds Rail Duplication, providing more frequent and reliable services and better stations for passengers on Victoria’s busiest regional rail line.

The alliance was made up of ourselves, Downer, ARUP and WSP.

Fast Facts

  • 8 km of track duplication and signalling upgrades
  • Two level crossing removals using rail bridges
  • Two new stations
South Geelong to Waurn Ponds  Rail Duplication
About Us (typically use first)

About Us (typically use first)

For over 65 years customers have been coming to McConnell Dowell with complex projects that require innovative solutions. That's why we're known as the Creative Construction company.

From remote resources and energy projects to city-shaping infrastructure, we've built thousands of quality assets and facilities.

Engineering-led, our expertise has grown steadily to span building, civil, electrical, fabrication, marine, mechanical, pipelines, rail, tunnel and underground construction..

H2030 Strategy

H2030 Strategy

Centred on our engineering heritage and ‘Creative Construction’ value proposition, our Horizon 2030 strategy provides the framework and roadmap for our longer-term market positioning and investment.

The strategy responds to the major trends impacting the world and our industry, both today and into the future. These include climate change, water security, urbanisation, defence self-reliance, and energy transition.

It is enabled by a three-tiered capability platform, as shown in the diagram below...

Closing Text - General with contacts, no video

Summary

Thank you for taking an interest in McConnell Dowell's skills, capabilities and approach. Additional information is available on our website, including additional project case studies.

Contact us through the link(s) below for advice or assistance with your project.