Company Profile

Company Profile

Prepared for Prepared for APA for the MGP and DGP Pipeline Construction Expression of Interest

May 2026

Introduction General

Introduction General

Thank you for the opportunity to present this brief capability statement which details a cross-section of our skills and experience, and showcases a selection of our recent projects.

About Us (typically use first)

About Us (typically use first)

For over 65 years customers have been coming to McConnell Dowell with complex projects that require innovative solutions. That's why we're known as the Creative Construction company.

From remote resources and energy projects to city-shaping infrastructure, we've built thousands of quality assets and facilities.

Engineering-led, our expertise has grown steadily to span building, civil, electrical, fabrication, marine, mechanical, pipelines, rail, tunnel and underground construction..

Our History (use sparingly)

Our History (use sparingly)

In 1961, two ambitious young engineers from New Zealand—Malcolm McConnell and Jim Dowell—set out with a bold vision: to build a company that would do things better than the one they worked for. That vision marked the birth of McConnell Dowell.

Since then, innovation and creative construction have remained at the heart of everything we do.

Here's our 65 year history through the decades...

Purpose & Values (typically use 2nd or 3rd)

Purpose & Values (typically use 2nd or 3rd)

We are a Purpose and Values driven organisation. These define what's important to us, guide our decision making and unite us behind a common goal.

Our Purpose is Providing a Better Life.

We do that through delivering projects that connect, sustain and enhance communities, and through providing career opportunities that challenge, reward and grow our people.

We also have five company values that guide our behaviours and decisions. Our values are:

Safety

Safety

We never compromise on safety.

We foster our 'Home Without Harm' safety culture through robust processes, effective systems, and by recognising and rewarding safe behaviours.

Our Site Safety Managers are always on our project leadership teams, ensuring safety is prioritised in all site activities. Every team member has clear safety responsibilities, aimed at protecting themselves, their colleagues, and the community.

We're also leading our industry in the adoption of new safety technologies, like virtual reality plant simulators and AI-enabled blind spot elimination. Check out the case studies below for more information.

Underpinning it all are our Safety Golden Rules. Built on our long-term collective knowledge and learnings, they are specifically targeted at preventing fatalities and serious injuries.

inpage image safety

SGR webpage banner

safesites banner wide

Sustainability (ESG)

Sustainability (ESG)

Our purpose is 'Providing a Better Life’ - today and into the future. That’s why sustainability, in all its forms, is considered in every project, process and product across our business.

Our approach is clearly articulated in our Sustainability Policy.

We're about action not just aspiration. Our ambitious but achievable {tip title="Carbon Reduction Roadmap" content="MCD Carbon roadmap 2030"} carbon reduction road-map {/tip} will see us be operationally net zero by 2030, with 44 initiatives that are being progressively rolled out across the company. Last year we reduced our carbon emissions by 442 tonnes through the use of solar technologies alone, and diverted almost two million tonnes of waste from landfill.

Our Solutions (typically use 4th to 8th)

Our Solutions (typically use 4th to 8th)

We offer our customers engineering and construction solutions in transport, water & wastewater, ports & coastal, energy, resources, and building.

Our services encompass the complete project lifecycle—from early concept design to commissioning and ongoing maintenance. We tailor each solution to suit our customer's specific project objectives and preferred delivery approach.

Jemena Early Contractor Involvement Northern Territory & Queensland, Australia

Northern Gas Pipeline

Constructing a 481 km transmission pipeline providing gas reserves to industries in Mt Isa

Engaged by Jemena under an exclusive ECI agreement, we designed and constructed the remote Northern Gas Pipeline, opening up the Northern Territory's gas reserves to industries in Mt Isa, Queensland.

Our scope involved the design and construction of approximately 481 km of 12-inch diameter high pressure gas transmission pipeline and associated pipeline facilities including two mainline valves and a midline scraper station. The pipeline transports gas from existing offshore and onshore gas reserves in the Northern Territory and will supply this gas to Incitec Pivot’s Phosphate Hill plant located south of Mt Isa and other users.

Fast Facts

  • 481 km, 12 inch pipeline
  • Three cathodic protection stations
  • Three mainline valve stattions
  • One midline station (pig trap)
Northern Gas Pipeline
  APA Group Construct Only Leinster, Western Australia

Agnew Gas Pipeline

After extensive pre-planning and a fast mobilisation, we constructed the Agnew Gas Pipeline Project for APA Group in the south-southwest of Western Australia. The new pipeline supplies gas to the Agnew gold mine site to supplement the mine’s renewables-fuelled power supply.

Our scope consisted of the construction of a 25 km long, DN150 mm, dual layer FBE coated, AS2885 compliant, high pressure natural gas pipeline, along with the tie-ins to the swan necks at the above ground Kyarra Offtake Station and the Agnew Delivery Station.

Fast Facts

  • 25 km long, 150 mm diameter gas pipeline
  • Multiple horizontal directional drills (HDDs) under roads
  • Fast mobilisation
  • Computerised radiography used
Agnew Gas Pipeline
Australia Pacific LNG EPC Gladstone, Queensland

APLNG Pipeline

Following successful completion of an Early Works contract for the APLNG project, MCJV, a joint venture between ourselves and Consolidated Contracting Company Australia Pty Ltd, was awarded an EPC contract for delivery of 360 km of the main export pipeline, a 57 km lateral pipeline, and associated facilties.

The overall APLNG project included the development of substantial coal seam gas resources in the Surat and Bowen Basins. The key elements of the project were the transmission pipeline, subsea crossing (Narrows Crossing) and a multi-train LNG facility on Curtis Island, near Gladstone.

Fast Facts

  • 360 km, 42" mainline pipeline
  • 57 km, 36" lateral pipeline
  • Launcher station at Condabri
  • Pipeline hub
  • Midline scraper station
  • 4 mainline valve stations
APLNG Pipeline
Fluor Australia Pty Ltd Construct Only Roma, Queensland

GLNG Upstream - Roma Hub and Pipelines

We constructed a 145 TJ per day gas compression and water treatment hub, with associated infrastructure and water gathering lines, at the coal seam gas fields north east of Roma in Queensland. The infrastructure enabled collection and processing of gas for delivery via an export pipeline to an LNG processing plant on Curtis Island, off Gladstone.

The large and complex project required a multi-disciplinary approach, with a focus on facilities for gas compression, power generation and water treatment, in addition to pipeline construction.

Fast Facts

  • 287 km, 63-800 mm diameter PE pipelines
  • 40 km, 100-250 mm diameter CS pipelines
  • LTI free
GLNG Upstream - Roma Hub and Pipelines
Pipelines

Pipelines

We've delivered over 20,000 km of new pipe networks. 

McConnell Dowell is a leading international pipeline contractor. We have constructed over 20,000 km of new pipe networks across more than 200 projects including gas, petroleum, water and slurry pipelines. These pipelines help drive economic and social progress across Australia, New Zealand, and South East Asia.

We are experts in large diameter pipeline construction and have delivered gas pipelines up to 1300 mm (50”) in diameter and water pipelines up to 1800 mm (70”) in diameter. Our in-house specialist skills and plant enable execution of HDD, micro-tunnelling, marine pipe pulls, pipe bridges and other complex crossing solutions.

APA Group Construct Only Western Australia

Lake Way and Karlawinda Gas Pipelines

We constructed the Lake Way Gas Pipeline (LWP) and the Karlawinda Gas Pipeline (KGP) projects for APA Group in Western Australia.

The LWP pipeline is located 15 kilometres south of Wiluna and transports natural gas from APA’s Goldfields Gas Pipeline (GGP) to SO4’s Lake Way facility. SO4 aims to become a major exporter of Sulphate of Potash and the LWP pipeline provides gas for fuelling power generating facilities and other equipment within their process plant.

Fast Facts

  • Two high pressure gas pipeline projects
  • 26 km of DN100 gas pipeline
  • 56 km of DN100 gas pipeline
Lake Way and Karlawinda Gas Pipelines
Gladstone Area Water Board Design & Construct Gladstone, Queensland

Fitzroy to Gladstone pipeline

Improving long-term water security

We're delivering the Fitzroy to Gladstone Pipeline (FGP) project for the Gladstone Area Water Board (GAWB) and the Queensland Government. The project, which will have the capacity to transport 30 gigalitres per annum, will enable long-term water security for urban and industrial customers in the region.

The FGP, which comprises an approximately 117 km long, 1 m diameter pipeline, a water treatment plant, reservoirs, and pumping stations, will also support the emerging hydrogen industry in the Gladstone region of Queensland. We have teamed up with BMD Constructions in a joint venture (the MBJV) to deliver the Project.

Fast Facts

  • 117 km long, 1 m diameter pipeline
  • New water treatment plant
  • Reservoirs and pumping stations
  • 21 trenchless crossings
  • $10 million First Nations spend
Fitzroy to Gladstone pipeline
APA Group Construct Only Lenora, Western Australia

Murrin Murrin Gas Pipeline Looping

We constructed the Murrin Murrin Looping Project for APA Group, east of Lenora in Western Australia. The objective of the project was to increase the capacity of the Murrin Murrin Lateral to enable APA to service future downstream customers.

Our scope consisted of the construction of a 13.8 km long, 200 mm diameter high pressure gas pipeline, along with the tie-ins to an existing above-ground offtake station. The pipeline runs from a connection off the existing Murrin Murrin Lateral.

Fast Facts

  • 13.8 km, 200 mm diameter gas pipeline
  • Zero Lost Time Injuries
  • Practical completion acheived 3 days early
Murrin Murrin Gas Pipeline Looping
Queensland Alumina Limited Design and Construct Gladstone, Queensland

QAL Waste Line Replacement

We designed, supplied, constructed and commissioned this new above ground bauxite waste line, completing the works eight weeks ahead of an accelerated schedule and 13 weeks ahead of the original contract completion date. Now completed, the new line protects the local waterways and environment.

Traversing a marine tidal zone, the project drew on our leading pipeline and marine expertise and involved the:

Fast Facts

  • 8.8 km DN 350 above ground pipeline
  • 1400 support structure piles in water
  • Zero lost time injuries
  • Zero environmental incidents
  • Completed 13 weeks ahead of schedule
QAL Waste Line Replacement
Creative Construction

Creative Construction


Creative Construction at McConnell Dowell is the inspired engineering behind the complex infrastructure we deliver.

It's the technical problems and challenges solved behind the scenes by people empowered to think creatively and work collaboratively. It’s the alternative idea or innovation that saves time, reduces cost, makes us safer, and delivers more value. 

It might not always be evident when you look at the end product, but it's there, inside every McConnell Dowell project.

Using 4D planning to streamline project delivery

Using 4D planning to streamline project delivery

On a recent rail duplication project in Melbourne, our team used digital engineering and 4D modelling to streamline the design and "rehearse" the construction of a 340 tonne steel bridge being launched over a waterway.

The 4D planning exercise was a game changer in helping the design, engineering and construction teams achieve an authentic digital rehearsal. The process helped identify and rectify early problems, including a clash between temporary and permanent retaining walls, as well as signalling cables and wall panels.

After months of painstaking planning and the ‘virtual launch’,  the 63 metre long, 340 tonne steel bridge structure was successfully moved into position during the rail occupation.

The project team received an innovation award for the work done on this project.

Our Approach (typically use 2nd or 3rd)

Our Approach (typically use 2nd or 3rd)

We approach every project with a focus on creativity and certainty - seeking the right blend of innovation and safe, proven approaches so we can exceed our customers' expectations.

We also understand that construction today is as much about community and sustainability as it is about concrete and steel. Our unwavering objective and commitment is to deliver what we promise to our customers, while protecting and enhancing our people, the community and the environment.

Contacts

Claire Tanner

Claire Tanner

Pre-Contracts Manager SA & WA

M: +61 (0)418 645 297

LinkedIn