Prepared for Graduate Program
May 2026
As we begin the assessment process we thought we'd share this short information pack, which explains the benefits of working with us, and showcases our capabilities and some of the interesting projects we deliver.
Our Graduate Program spans a two-year journey, empowering you to embark on a fulfilling career path. It's designed to nurture your growth, offer valuable learning experiences, and fulfil your potential.
We offer our graduates opportunities in:
From remote resources and energy projects to city-shaping infrastructure, we've built thousands of quality assets and facilities.
Engineering-led, our expertise has grown steadily to span building, civil, electrical, fabrication, marine, mechanical, pipelines, rail, tunnel and underground construction..
We do that through delivering projects that connect, sustain and enhance communities, and through providing career opportunities that challenge, reward and grow our people.
We also have five company values that guide our behaviours and decisions. Our values are:
It's the technical problems and challenges solved behind the scenes by people empowered to think creatively and work collaboratively. It’s the alternative idea or innovation that saves time, reduces cost, makes us safer, and delivers more value.
It might not always be evident when you look at the end product, but it's there, inside every McConnell Dowell project.
We recently completed Stage 1 of the Swanson Dock West Remediation, and are now delivering Stage 2. This is our sixth project for Port of Melbourne since 2017.
Swanson Dock West (SDW) is a critical International Container Terminal comprising of a 944 m wharf with three container-handling berths, which were constructed in several stages between the 1960s and 1980s. The existing wharf is of varying forms of construction and some sections are close to or beyond the typical design life of 30 years. As a result, major remediation was needed.
The Midland Junction Alliance (MJA), an alliance comprising of ourselves, Georgiou Group, Arcadis and BG&E, is delivering the new METRONET Midland Station in Perth, Western Australia. METRONET is a multi-government agency created to oversee the expansion of Perth's metropolitan transport network.
The Midland Station project includes decommissioning and demolishing the existing 53 year old train station and the design and construction of a new station between Helena and Cale streets.
We delivered the New Bridgewater Bridge project in Hobart - Tasmania's largest ever transport infrastructure project and one of the longest road bridges over water in Australia. The Tasmanian Department of State Growth awarded us the contract based on our innovative design and focus on local industry participation.
The new 1.28 kilometre long bridge replaces the existing lift-span bridge built in the 1940s, providing a new modern crossing of the River Derwent. The new bridge will cut travel times for the 22,000 people that use the route each day. It will also improve freight movement around the state capital.
We are constructing the Kidston Pumped Storage Hydro Project in Far North Queensland - an innovative project that involves the world-first conversion of a disused gold mine into a pumped storage hydroelectric power generation facility.
This first-of-its-kind natural battery storage facility has the potential to generate up to 250 MW of rapid response (less than 30 seconds), flexible power to Australia’s National Electricity Market.
We successfully delivered two new wharves at La Perouse and Kurnell on Botany Bay (Kamay) for the NSW Government. These modern structures replace the original wharves, which had been in operation from the 1890s until 1974, when severe storms rendered them beyond repair.
The Kurnell site holds deep historical and cultural significance. As the first landing place of Captain James Cook, it is a key part of Australia’s colonial history. Equally important, the area remains a place of enduring cultural heritage for First Nations people. To honor this, the wharf designs incorporate large-scale artworks by local Aboriginal artists, creating a meaningful connection to Country.
We are the constructor and leader of the Western Program Alliance, delivering part of the Victorian state government’s ambitious level crossing removal program, which is set to remove 110 dangerous level crossings by 2030.
Our Alliance brings together ourselves, the Level Crossing Removal Project (government), MTM and V/Line (network operators), and Arup and Mott MacDonald (design partners).
In joint venture with Diona (the Water North JV) we're one of three major framework partners delivering SA Water’s multi-billion dollar capital delivery program. The 'Frameworks' model fosters collaboration and innovation in the planning and delivery of water projects across metro and regional South Australia.
During the first four years (2020 - 24) our team delivered approximately 150 projects, including the design and construction of:
Diverse projects and roles mean more development opportunities, and we invest in your growth through training and top-notch mentoring.
We're leaders in mental health and well-being, promoting balance through flexible work options, and having industry-leading Employee Assistance and Benefits programs. {show php="return(region('aus'));"} (Australian benefits program) {/show}
Thank you for considering McConnell Dowell in your future career plans. We hope this information has provided you with some additional insights into the exciting work we do, and the benefits of working with us.