From remote resources and energy projects to city-shaping infrastructure, we've built thousands of quality assets and facilities.
Engineering-led, our expertise has grown steadily to span building, civil, electrical, fabrication, marine, mechanical, pipelines, rail, tunnel and underground construction..
The strategy responds to the major trends impacting the world and our industry, both today and into the future. These include climate change, water security, urbanisation, defence self-reliance, and energy transition.
It is enabled by a three-tiered capability platform, as shown in the diagram below...
We understand what matters most to our water industry customers - uninterrupted supply, minimal disruption, safety, compliance, and positive community engagement.
We've been entrusted with the design and delivery of major metro desalination and water treatment plants, as well as the construction of dams and large-diameter pipeline and pump station networks.
We've delivered approximately $9 billion in new water assets over the last 15 years, including:
On behalf of Unitywater, we're delivering critical new water and wastewater infrastructure to support growth on Queensland's Sunshine Coast. The new pipelines, pump stations, and storage reservoirs will support the new Aura and Harmony communities in the Caloundra region.
For the Aura development (which will grow to 50,000 residents by 2050), we're delivering a new wastewater network that includes over 12 km of 900 mm diameter pipeline and one pump station. We're also delivering a new water supply network for this community, that includes over 12 km of 800 mm diameter pipeline connecting the Ewen Maddock Dam to a new 12 ML water reservoir.
In joint venture with Diona (the Water North JV) we're one of three major framework partners delivering SA Water’s multi-billion dollar capital delivery program. The 'Frameworks' model fosters collaboration and innovation in the planning and delivery of water projects across metro and regional South Australia.
During the first four years (2020 - 24) our team delivered approximately 150 projects, including the design and construction of:
We're delivering the Fitzroy to Gladstone Pipeline (FGP) project for the Gladstone Area Water Board (GAWB) and the Queensland Government. The project, which will have the capacity to transport 30 gigalitres per annum, will enable long-term water security for urban and industrial customers in the region.
The FGP, which comprises an approximately 117 km long, 1 m diameter pipeline, a water treatment plant, reservoirs, and pumping stations, will also support the emerging hydrogen industry in the Gladstone region of Queensland. We have teamed up with BMD Constructions in a joint venture (the MBJV) to deliver the Project.
Drawing on our industry-leading trenchless construction experience, we delivered the Warkworth to Snells Transfer Pipeline for Watercare, continuing our strong relationship with them.
The project was part of Watercare's North-East Wastewater Servicing Scheme, which conveyed wastewater from Warkworth to Snells Beach. The scheme will cater for future growth and enable Watercare to decommission the existing Warkworth Wastewater Treatment Plant, which discharges into the Mahurangi River.
As the principal contractor within the Southern Regional Water Pipeline Alliance, we designed and delivered a new 200-megalitre-per-day water grid on a fast-track program to support the rapidly growing population of South East Queensland.
The project was delivered during the worst drought on record, with Brisbane's water storages at less than 15 percent capacity. This 'need for speed' necessitated concurrent progress in land access, design, approvals, and procurement.
We used the optimum mix of tunnelling and trenched construction techniques to deliver the Barber Grove to Seaview Wastewater Treatment Plant Pipe Duplication Project for Wellington Water, causing the least impact possible.
The project involved the installation of a new 1.2 km long, 1 m diameter pressurised wastewater pipeline. It services 90% of the residents in Hutt Valley, improving water quality and catering to the region’s growth.