Port of Melbourne Design and Construct Melbourne, Victoria

Port Capacity Project - Webb Dock

Enhancing and expanding Australia's busiest container port

We received the Australian construction industry's highest accolade for this major wharf redevelopment within Melbourne's main port precinct.

This was a large and complex marine project delivered within Australia's busiest operational container port, and within very tight environmental controls to protect the rich marine life within the surrounding bay.

Fast Facts

  • 900 tubular steel piles up to 1500 mm diameter and 45 m long driven as single length piles.
  • 40,000 m³ of structural concrete.
  • 10,000 tonnes of reinforcing steel.
  • 40,000 m of sheet pile installation.
  • 210,000 tonnes of imported quarry product.
  • 15,000 m³ of rehabilitated concrete deck.
Port Capacity Project - Webb Dock
Port of Melbourne Early Contractor Involvement Melbourne, Victoria

Swanson Dock East Berths 1 & 2 Rehabilitation

Collaborative Approach, Safety Focus, and Minimising Disruptions in Port Rehabilitation Project

Working in collaboration with the Port of Melbourne, we successfully completed four contracts at Swanson Dock between 2017 and 2020.

After completing the award winning Port Capacity Project, we continued our partnership with Port of Melbourne with a series of smaller contracts to rehabilitate the iconic Swanson Dock - the heart of Australia's busiest container terminal.

Fast Facts

  • Multiple projects successfully completed without disrupting port operations
  • 412 piles driven
  • 570 tonnes of reinforcement used
  • 3,600 m2 of new wharf deck laid
Swanson Dock East Berths 1 & 2 Rehabilitation
Port of Melbourne Early Contractor Involvement, leading to lump sum contract Melbourne, Victoria

Swanson Dock West remediation

We recently completed Stage 1 of the Swanson Dock West Remediation, and are now delivering Stage 2. This is our sixth project for Port of Melbourne since 2017.

Swanson Dock West (SDW) is a critical International Container Terminal comprising of a 944 m wharf with three container-handling berths, which were constructed in several stages between the 1960s and 1980s. The existing wharf is of varying forms of construction and some sections are close to or beyond the typical design life of 30 years. As a result, major remediation was needed.

Fast Facts

  • A three-staged wharf remediation project
  • McConnell Dowell's sixth project for this customer since 2017
  • Works programmed around operational wharf
Swanson Dock West remediation