It's the technical problems and challenges solved behind the scenes by people empowered to think creatively and work collaboratively. It’s the alternative idea or innovation that saves time, reduces cost, makes us safer, and delivers more value.
It might not always be evident when you look at the end product, but it's there, inside every McConnell Dowell project.
Our American Samoa team completed the contract to resurface and rehabilitate the asphalt pavement on the primary runway at Pago Pago International Airport in mid-2025.
This is the ninth project we've completed for the Pago Pago International Airport. Other recent projects for the Airport included upgrading 915 m (3,000 feet) of the runway, for Stage One of Runway 5-23 completed in 2018, and the Apron Rehabilitation Project finished in 2020.
We delivered the Leone Village Bridge Replacement in American Samoa on behalf of the US Army Corps of Engineers after the original bridge was damaged by a devastating tsunami.
The award of this contract was due to the substantial cost savings our team presented with our design, as compared to our customer's design.
Proposing a trenchless solution to minimise disruption, Watercare Services awarded us the Snells Algies wastewater pipe and outfall construction project. It resulted in new world record - a 2021 metre long Direct Pipe® drive delivered using a micro tunnel boring machine.
The project was the first phase of a three-phased scheme to improve water quality in the Mahurangi Harbour and cater for population growth in the Warkworth and Mahurangi East communities north of Auckland.
Thank you for taking an interest in McConnell Dowell's skills, capabilities and approach. Additional information is available on our website, including additional project case studies.
Contact us through the link(s) below for advice or assistance with your project.