Capability Statement

Prepared for Prepared for Victorian Renewable Energy Terminal (VRET)

May 2026

Introduction General

Introduction General

Thank you for the opportunity to present this brief capability statement which details a cross-section of our skills and experience, and showcases a selection of our recent projects.

About Us (typically use first)

About Us (typically use first)

For over 65 years customers have been coming to McConnell Dowell with complex projects that require innovative solutions. That's why we're known as the Creative Construction company.

From remote resources and energy projects to city-shaping infrastructure, we've built thousands of quality assets and facilities.

Engineering-led, our expertise has grown steadily to span building, civil, electrical, fabrication, marine, mechanical, pipelines, rail, tunnel and underground construction..

Port of Melbourne Design and Construct Melbourne, Victoria

Port Capacity Project - Webb Dock

Enhancing and expanding Australia's busiest container port

We received the Australian construction industry's highest accolade for this major wharf redevelopment within Melbourne's main port precinct.

This was a large and complex marine project delivered within Australia's busiest operational container port, and within very tight environmental controls to protect the rich marine life within the surrounding bay.

Fast Facts

  • 900 tubular steel piles up to 1500 mm diameter and 45 m long driven as single length piles.
  • 40,000 m³ of structural concrete.
  • 10,000 tonnes of reinforcing steel.
  • 40,000 m of sheet pile installation.
  • 210,000 tonnes of imported quarry product.
  • 15,000 m³ of rehabilitated concrete deck.
Port Capacity Project - Webb Dock
Port of Melbourne Early Contractor Involvement Melbourne, Victoria

Swanson Dock East Berths 1 & 2 Rehabilitation

Collaborative Approach, Safety Focus, and Minimising Disruptions in Port Rehabilitation Project

Working in collaboration with the Port of Melbourne, we successfully completed four contracts at Swanson Dock between 2017 and 2020.

After completing the award winning Port Capacity Project, we continued our partnership with Port of Melbourne with a series of smaller contracts to rehabilitate the iconic Swanson Dock - the heart of Australia's busiest container terminal.

Fast Facts

  • Multiple projects successfully completed without disrupting port operations
  • 412 piles driven
  • 570 tonnes of reinforcement used
  • 3,600 m2 of new wharf deck laid
Swanson Dock East Berths 1 & 2 Rehabilitation
  Flinders Port Holdings Early Contractor Involvement Adelaide, South Australia

Outer Harbour Berth 6 Extension

Increasing container port capacity in South Australia

After a 6-month Early Contractor Involvement process, we're now delivering a berth extension and remediation works at the Flinders Adelaide Container Terminal (FACT) — South Australia’s only container terminal.

Our works form part of Flinders Port Holdings’ (FPH) A$350 million GatewaySA Program, a multi-year initiative designed to increase capacity, efficiency and sustainability across the terminal.

Fast Facts

  • 135 m berth extension
  • Quay-line extention and strutural remediation
  • Site-wide services, hardstands and access road upgrades.
Outer Harbour Berth 6 Extension
DefenceSA | Government of South Australia Early Contractor Involvement Adelaide, South Australia

Common User Facility (Techport)

In one of the first Early Contractor Involvement (ECI) contracts in Australia, we designed and delivered the Techport Australia Common User Facility - a new state-of-the-art shipbuilding and maintenance complex on the Port River at Osborne, South Australia. We delivered it in joint venture with our building company, Built Environs (the MDBE JV).

The project was rolled out in two stages. In the first stage, our team worked in collaboration with design and technology partners and DefenceSA to develop the final design and risk adjusted price.

Fast Facts

  • 213 m long, 25 m wide wharf
  • 450,000 m3 material dredged
  • 34 m x 160 m new shiplift pocket
  • Installation of Australia's largest shiplift
  • Works conducted in a sensitive marine environment and dolphin sanctuary
Common User Facility (Techport)
Australian Naval Infrastructure (ANI) Early Contractor Involvement leading to lump sum contract Osborne Naval Shipyard, Adelaide

CUF Marine Development Works

Supporting Australia's shipbuilding capacity

Fast Facts

  • Construction of 80 - 100 m land backed wharf
  • 40,000 m3 of dredging
  • Berth kiosk services, including water and eletrical supplies
CUF Marine Development Works
Port of Melbourne Early Contractor Involvement, leading to lump sum contract Melbourne, Victoria

Swanson Dock West remediation

We recently completed Stage 1 of the Swanson Dock West Remediation, and are now delivering Stage 2. This is our sixth project for Port of Melbourne since 2017.

Swanson Dock West (SDW) is a critical International Container Terminal comprising of a 944 m wharf with three container-handling berths, which were constructed in several stages between the 1960s and 1980s. The existing wharf is of varying forms of construction and some sections are close to or beyond the typical design life of 30 years. As a result, major remediation was needed.

Fast Facts

  • A three-staged wharf remediation project
  • McConnell Dowell's sixth project for this customer since 2017
  • Works programmed around operational wharf
Swanson Dock West remediation
BCI Minerals Early Contractor Involvement Pilbara, Western Australia

Mardie Salt & Potash Marine Structures

Delivering new marine facilities to grow Australian exports

We designed and constructed the marine structures for BCI Minerals’ Mardie Salt & Potash Project in Western Australia, using our innovative canti-traveller system for speed and low impact delivery.

The 'Mardie' Project is a large-scale, solar evaporation operation on the Pilbara coast. Capacity of the completed facility is estimated to be 5.35 million tonnes per annum of high purity salt and 140,000 tonnes per annum of sulphate of potash, over an operating life of at least 60 years.

Fast Facts

  • 2.4 km long jetty with berthing and mooring dolphins
  • 200 steel piles, up to 30 metres long
  • 100 m of jetty completed every 10 days using innovative canti-traveller system
Mardie Salt & Potash Marine Structures
Rio Tinto Design and Construct Weipa, Far North Queensland

Chith Export Facility

We revolutionised the design and construction of large-scale marine infrastructure when we delivered the Chith Export Facility - a large, complex and remotely located project for Rio Tinto at their Amrun bauxite mine, south of Weipa in Far North Queensland.

The facility comprises a 650 m access jetty, a 350 m loading wharf and an onshore conveyor system. Innovatively designed by Jacobs and constructed by us in just 10 months, modularisation was at the heart of the solution and our project team took it to new levels in scale and breadth.

Fast Facts

  • 650 m access jetty
  • 350 m long loading wharf
  • Fully modularised construction approach
  • 300,000 job-hours saved
  • Build time reduced by 12 months to just 10 months
  • Capital expenditure reduced by $40M
Chith Export Facility
Squadron Energy EPC Port Kembla, New South Wales

Port Kembla Energy Terminal

Converting disused coal terminal to provide flexible energy supply

Engaged by Squadron Energy, one of Australia’s leading renewable energy companies, we helped establish a new gas import facility at Port Kembla to bring flexible additional energy supply to the eastern seaboard of Australia.

The facility, built on an abandoned coal export terminal, has the capacity to supply more than 70% of NSW’s gas needs.

Fast Facts

  • New gas import facility
  • Two contracts completed - marine works and onshore receiving facilities
  • Marine works involving 160 piles, each 1500 mm diameter
  • Over 500 sheet piles
  • Nine mooring dolphins
  • Expected capacity: 130PJ annually
Port Kembla Energy Terminal
Port Kembla Port Corporation Design and Construct Port Kembla, New South Wales

Port Kembla Outer Harbour Tug Berth

When Port Kembla Port Corporation needed to replace one of NSW's oldest jetties, we brought their vision to fruition and turned what was a liability into a world-class asset.

We constructed a new 270 m long breakwater jetty using 90,000 m3 of imported rockfill and 20,000 m3 of rock armour. Prior to commencing the works, approximately 30,000 m3 of sandy clay, stiff clay and loose rock was dredged from the harbour floor using a Cutter Suction Dredge (CSD) and pumped one km into the outer harbour.

Fast Facts

  • 270 m long breakwater
  • 90,000 m3 of imported rockfill
  • 30,000 m3 of dredging
  • 1800 m2 of asphalt paving
  • Two navigation beacons installed
Port Kembla Outer Harbour Tug Berth
Major Road Projects Victoria (MRPV) Design and Construct Melbourne, Victoria

Mordialloc Freeway

The McConnell Dowell Decmil Joint Venture delivered the Mordialloc Freeway in Melbourne’s south east four weeks ahead of schedule while setting new industry benchmarks in sustainability and workplace mental health management.

The nine kilometre freeway links the Mornington Peninsula Freeway at Springvale Road in Aspendale Gardens to the Dingley Bypass in Dingley Village, creating a continuous freeway from Frankston To Clayton.

Fast Facts

  • 9 km long multi-lane freeway
  • 6 road bridges constructed
  • 8 km of shared walking/cycling paths
  • 3 million tonnes of earthworks imported
  • 74 km of utilities relocated
  • 97% of construction waste diverted from landfill
Mordialloc Freeway

Closing Text - General with contacts, no video

Summary

Thank you for taking an interest in McConnell Dowell's skills, capabilities and approach. Additional information is available on our website, including additional project case studies.

Contact us through the link(s) below for advice or assistance with your project.

Contacts

Rebecca Neeson

Rebecca Neeson

Pre-contracts Manager - Vic & Tas

LinkedIn